High Power Solar Battery

High Power Solar Battery

  • Description
  • Reviews (0)

Description

High Power UPS/Solar Battery

 

  

 

Rechargeable 800 Ah OPzS Battery Solar / UPS Power Storage Batteries

Energy Storage Rechargeable Tubular Plate OPzS battery 2v 800Ah solar battery

Description:

Champion OPzS batteries are designed with a combination of die-casting Tubular positive framework and superfluous electrolyte technologies to offer a very  high lever of reliability and a long service life. Opzs batteries used special filter and proof design to ensure no acid fog runs over and burning proof, and also convenient examine and maintenance.

OPzS  Batteries belong to the most enduring lead acid batteries. They are suitable for stand – by operations as well as for capacitive loads. They perfectly meet requirements for bridging times more than 10 h.

Applications:

Telecommunications

Power plant

UPS

Railroad Utility

Electric Utility

Photovoltaic Systems

Specifications:

Model Voltage Capacity Dimension(mm) Terminal Terminal Weight ±3%(Kg)
(V) (Ah) L W H TH Type Position Dry Wet Acid
(d1.24)
OPzS 200 2 200 103 206 355 410 F12 7 13 17.5 4.5
OPzS 250 2 250 124 206 355 410 F12 7 15 20.5 5.5
OPzS 300 2 300 145 206 355 410 F12 7 17.5 24 6.5
OPzS 350 2 350 124 206 471 526 F12 7 21 28 7
OPzS 420 2 420 145 206 471 526 F12 7 23 32 9
OPzS 490 2 490 166 206 471 526 F12 7 26.5 37.5 11
OPzS 600 2 600 145 206 646 701 F12 7 35 47 12
OPzS 800 2 800 191 210 646 701 F12 8 48 64 16
OPzS 1000 2 1000 233 210 646 701 F12 8 58 78 20
OPzS 1200 2 1200 275 210 646 701 F12 8 68 92 24
OPzS 1500 2 1500 275 210 796 851 F12 8 80 111 31
OPzS 2000 2 2000 397 212 772 827 F12 12 110 152 42
OPzS 2500 2 2500 487 212 772 827 F12 9 132 185 53
OPzS 3000 2 3000 576 212 772 827 F12 9 159 222 63

 

Competitive Advantage:

Maintenance convenience;

Non-Spillable construction design

Transparent containers, convenient to observe;

Special filter installation for acid fog proof;

High quality and high reliability;

Super long service life;

Special pole sealed technology;

Super reliability.

Battery Installation Guide

  1. Point for attention during installation

(1) Reading is technical handbook prior to operation to ensure constructing correctly. Batteries shall be checked one by one to prevent from abnormal voltage prior to installation.

(2) Insulation tools should be used when installing & removing conductive connection slices due to higher serial voltage to protect from electric hit.

(3) During transportation & installation, battery’s short-circuit must be paid attention to because the battery delivered is electric.

(4) The battery with sealed free maintenance construction hasn’t changer of etching skin and eyes in normal case. Once sulphuric acid splashed in one’s eye’s rinsing with a plenty of water must be done and go to hospital.

(5) Exterior surface shall be washed with soap water and wet cloth .Dry cloth and duster shouldn’t be used, which can produce static to cause explosion, organic solvent shouldn’t be used either.

  1. Installation of storage battery

(1) Battery may be installed in any direction (with the exception of turning upside down ) connection must be according to serial/parallel circuit. It is not allowable for incorrect and reverse pole connection.

(2) Oxides and dirty on battery’s terminals contact surface should be removed with sandpaper or iron brush to reduce contacting resistance and prevent from producing heat. A layer of vaselinum oil must be coated prior to installation. Check the system’s general voltage and positive & negative pole before power is on to ensure right installation.

(3) Shorten connecting cables if it is possible. Voltage drop produced should be taken consideration into selection of cables and for the cable’ specification, output capacitance shall not be as a unique factor.

(4) Battery may be shunted to reach its capacitance required. To reduce voltage drop, shunted connecting wire shall be most probably short.

(5) Batteries with different capacitance and /or performances and /or new & old degree shouldn’t be taken into service together.

(6) Battery should avoid installing inside on enclosed device. Good air ventilation is required. Don’t mount it nearby heat generating objectives e.g. transformer etc.

(7) Torque value for connecting battery shall be 11.3 N/M.

(8) Circuit switch shall be in position of “off” and the battery’s positive/negative pole shall be in that of corresponding connection of charger’s (load’s) positive/negative pole.

 

Reviews

There are no reviews yet.


Be the first to review “High Power Solar Battery”